MANAGE XPS: Different spheres of project life cycle problem handler

The software package MANAGE XPS handles problems related to different spheres of project life cycle. MANAGE XPS finds its utility suited for a variety of projects where the user is able to provide input in the form of precedence relationships, time, cost and resource requirements of the activities of the project with gantt chart generator included.

MANAGE XPS consists of various program modules mutually incorporated to form an integrated software package utility. The integrated software package has a flexibility of application as per the requirement of the case under consideration.
A specific module can be used independently to assist in decision making for a particular problem associated to one of the stages in the life-cycle of a project, or an integrated utility of the software can be used for a broader application.

Open source project management software language:
  • Visual Basic 6.0
  • A-O-N
  • Gantt chart generation.
  • Critical path, float calculation.
  • Resource profile generation.
  • Resource leveling through simulation.
  • Resource allocation based on various priority rules.

Download list:
User Manuals: Managexp_Manual-1.1.zip
Exe file: Managexps-1.1.zip
Source: Managexps-src-1.1.zip
Project website: pmanage
Project Admins: achalmeena
Operating System: All 32-bit MS Windows (95/98/NT/2000/XP)
License: GNU General Public License (GPL)
Category: Office Suites, Scheduling, Other/Nonlisted Topic, Scientific/Engineering